Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8478736
| No.8478736
- Product Categories
- Friendly Links
| Information Name: | Pig processor, the preferred order of gas equipment factory in Dafeng |
| Published: | 2011-08-01 |
| Validity: | 30 |
| Specifications: | |
| Quantity: | 1.00 |
| Price Description: | |
| Detailed Product Description: | Pig processor, the preferred order of gas equipment factory in Dafeng Dafeng biogas energy equipment factory in the order of Located in the beautiful and rich Yellow Sea, the National Wetland Park - Dafeng City. Founded in 1999, the plant material predecessor Jiang Su Linfeng Machinery Manufacturing Co., Ltd., in 2010 restructuring. Our factory is committed to the development of biogas energy involved in biogas production, application of biogas residue, biogas slurry and other integration processes of design and construction, and gas storage to achieve a breakthrough, the production of gas cabinets and away from the marsh-action slag, slurry separation of GM small-scale sewage treatment equipment, has achieved national patent. Patent No. divided ZL2009.2.0004245.6 and ZL2009.2.0152299.7, compared to conventional devices in the technical life, greatly enhance the economy ... ...! Dafeng biogas energy equipment factory in the order of Address: Dafeng City Dahua Road 48, Hongji Building, 0603 Tel :0515 -8,328,488,883,531,111 8,351,000,083,424,888 National toll-free hotline :400 -696-8848 Fax :0515 -83,525,288 Mobile: 15861904888 18912528444 Contact: Welwyn Website: www.zczqsb.com www.yczhongkun.com The following is the promotion of the article, and unrelated to the company's products and services: Running water prior to use 70?% Of the material residue discharge port of the machine will actually fill to fill the newly installed extrusion machine users. Then adjust the weights on the location of the maximum torque,? Pressure extruder to form layers. Not filled layer extruder pressure is not the boot operation? Because manure pumped after the case in the absence of pressure, immediately spray the discharge port, please remember to fill in solid fill discharge port! ? Extruder to have someone with management, specifically to deal with people to understand the overall performance, and to be home for regular maintenance? Normal use, each month through a mesh screen to wash. Links: www.zczqsb.com www.yczhongkun.com www.huboyan.com www.cdjxm.com www.aoxing168.com www.cdxsgl.com www.cnjinpeng.com http://www.51mijijia.com http://www.51yanmianban.com http://www.xskled.com http://www.xskled.cn Pig processor, the preferred order of gas equipment factory in Dafeng |
Admin>>>
You are the 26507 visitor
Copyright © GuangDong ICP No. 10089450, Dafeng biogas energy equipment factory in the order of All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26507 visitor
Copyright © GuangDong ICP No. 10089450, Dafeng biogas energy equipment factory in the order of All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

