Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8478736
| No.8478736
- Product Categories
- Friendly Links
- home > Supply > Supply extruded aquaculture waste treatment equipment, gas find Dafeng energy equipment factory in the order of
Supply extruded aquaculture waste treatment equipment, gas find Dafeng energy equipment factory in the order of
| Information Name: | Supply extruded aquaculture waste treatment equipment, gas find Dafeng energy equipment factory in the order of |
| Published: | 2011-07-15 |
| Validity: | 30 |
| Specifications: | |
| Quantity: | 1.00 |
| Price Description: | |
| Detailed Product Description: | Squeeze-culture waste treatment equipment, gas find Dafeng energy equipment factory in the order of Dafeng biogas energy equipment factory in the order of Located in the beautiful and rich Yellow Sea, the National Wetland Park - Dafeng City. Founded in 1999, the plant material predecessor Jiang Su Linfeng Machinery Manufacturing Co., Ltd., in 2010 restructuring. Our factory is committed to the development of biogas energy involved in biogas production, application of biogas residue, biogas slurry and other integration processes of design and construction, and gas storage to achieve a breakthrough, Production of gas cabinets and away from the acting residue, biogas slurry separation of GM small sewage treatment facilities, and achieved national patent. Patent No. divided ZL2009.2.0004245.6 and ZL2009.2.0152299.7, Compared to conventional devices in the technology, life, greatly enhance the economy ... ...! Dafeng biogas energy equipment factory in the order of Address: Dafeng City Dahua Road 48, Hongji Building, 0603 Tel :0515 -8,328,488,883,531,111 8,351,000,083,424,888 National toll-free hotline :400 -696-8848 Fax :0515 -83,525,288 Mobile: 15861904888 18912528444 Contact: Welwyn Website: www.yczhongkun.com www.zczqsb.com The following is the promotion of the article, and unrelated to the company's products and services: Digested manure fermentation bed in the same time, loss of litter will gradually replenish the litter bed to keep the fermentation performance and stability of measures. Usually reduce the amount of litter after the 10% will replenish, add new material to the bed of the litter and fermentation mix, and regulate the water Summer season, students in the hard environmental separator platform activities and rest time increased, the fermentation bed separator for environmental temperature changes in the basic care does not have an impact. Therefore, based on the summer feeding and management, or management measures to strengthen conventional cooling (such as starting wet curtain, start the fan to enhance air exchange, etc.), the management of primary fermentation bed note the following issues: 1. The dawn of summer, gradually reduce the litter up water, so Links: www.zczqsb.com www.yczhongkun.com http://www.51yanmianban.com http://www.51mijijia.com http://www.17dazhaxie.com Squeeze-culture waste treatment equipment, gas find Dafeng energy equipment factory in the order of |
Admin>>>
You are the 26507 visitor
Copyright © GuangDong ICP No. 10089450, Dafeng biogas energy equipment factory in the order of All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26507 visitor
Copyright © GuangDong ICP No. 10089450, Dafeng biogas energy equipment factory in the order of All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

