Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8478736
| No.8478736
- Product Categories
- Friendly Links
- home > Supply > Supply of farming waste treatment, in order of biogas energy to find Dafeng Equipment Factory
| Information Name: | Supply of farming waste treatment, in order of biogas energy to find Dafeng Equipment Factory |
| Published: | 2011-07-14 |
| Validity: | 30 |
| Specifications: | |
| Quantity: | 1.00 |
| Price Description: | |
| Detailed Product Description: | Aquaculture waste treatment, in order of biogas energy to find Dafeng Equipment Factory Dafeng biogas energy equipment factory in the order of Located in the beautiful and rich Yellow Sea, the National Wetland Park - Dafeng City. Founded in 1999, the plant material predecessor Jiang Su Linfeng Machinery Manufacturing Co., Ltd., in 2010 restructuring. Our factory is committed to the development of biogas energy involved in biogas production, application of biogas residue, biogas slurry and other integration processes of design and construction, and gas storage to achieve a breakthrough, Production of gas cabinets and away from the acting residue, biogas slurry separation of GM small sewage treatment facilities, and achieved national patent. Patent No. divided ZL2009.2.0004245.6 and ZL2009.2.0152299.7, Compared to conventional devices in the technology, life, greatly enhance the economy ... ...! Dafeng biogas energy equipment factory in the order of Address: Dafeng City Dahua Road 48, Hongji Building, 0603 Tel :0515 -8,328,488,883,531,111 8,351,000,083,424,888 National toll-free hotline :400 -696-8848 Fax :0515 -83,525,288 Mobile: 15861904888 18912528444 Contact: Welwyn Website: www.yczhongkun.com www.zczqsb.com The following is the promotion of the article, and unrelated to the company's products and services: Referred to as CAD), has developed rapidly in recent years after a class. Centralized anaerobic digestion biogas project on behalf of the current trends in Europe. About a certain area adjacent to the farm manure and other organic waste collection, transportation to a gas station to focus, focus on the advantages of anaerobic digestion plant with economies of scale, can be more advanced anaerobic digestion treatment process and install equipment to process more efficient. Centralized anaerobic digestion in the late 1980s at the earliest operation from Denmark, has built 20 large-scale biogas plant of CAD, works well. Device the size of each block in the 2 000 ~ 4 000m3, in warm or hot, anaerobic digestion process is mainly methane fermentation of total mixed (CSTR) and plug-flow fermentation process (Plug flow), the residence time in the 12 to 20 days, in the fermentation pre-or post-processing of raw materials, including a high-temperature sterilization pasteurization process to prevent the spread of germs during processing. Gas central heating is generally used for the local community, or combined heat and power use (CHP). Biogas project development started over the United States Links: www.zczqsb.com www.yczhongkun.com http://www.51yanmianban.com http://www.51mijijia.com http://www.17dazhaxie.com Aquaculture waste treatment, in order of biogas energy to find Dafeng Equipment Factory |
Admin>>>
You are the 26507 visitor
Copyright © GuangDong ICP No. 10089450, Dafeng biogas energy equipment factory in the order of All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26507 visitor
Copyright © GuangDong ICP No. 10089450, Dafeng biogas energy equipment factory in the order of All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

