Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8478736
| No.8478736
- Product Categories
- Friendly Links
- home > Supply > Chicken supply extrusion process, in order of biogas energy to find Dafeng Equipment Factory
| Information Name: | Chicken supply extrusion process, in order of biogas energy to find Dafeng Equipment Factory |
| Published: | 2011-07-12 |
| Validity: | 30 |
| Specifications: | |
| Quantity: | 1.00 |
| Price Description: | |
| Detailed Product Description: | Squeeze chicken manure treatment, in order of biogas energy to find Dafeng Equipment Factory Dafeng biogas energy equipment factory in the order of Located in the beautiful and rich Yellow Sea, the National Wetland Park - Dafeng City. Founded in 1999, the plant material predecessor Jiang Su Linfeng Machinery Manufacturing Co., Ltd., in 2010 restructuring. Our factory is committed to the development of biogas energy involved in biogas production, application of biogas residue, biogas slurry and other integration processes of design and construction, and gas storage to achieve a breakthrough, Production of gas cabinets and away from the acting residue, biogas slurry separation of GM small sewage treatment facilities, and achieved national patent. Patent No. divided ZL2009.2.0004245.6 and ZL2009.2.0152299.7, Compared to conventional devices in the technology, life, greatly enhance the economy ... ...! Dafeng biogas energy equipment factory in the order of Address: Dafeng City Dahua Road 48, Hongji Building, 0603 Tel :0515 -8,328,488,883,531,111 8,351,000,083,424,888 National toll-free hotline :400 -696-8848 Fax :0515 -83,525,288 Mobile: 15861904888 18912528444 Contact: Welwyn Website: www.yczhongkun.com www.zczqsb.com The following is the promotion of the article, and unrelated to the company's products and services: Proposal to develop a winter night patrol the habit of environmental separator homes, a separate cluster to check whether the abnormal environment, and second, to check the insulation equipment and discounted temperature is normal, so that preventive measures. Fourth, effective insulation The practical test, if the cement floor, the air temperature and a difference of about 5 ℃ concrete floor, due to environmental separator Aberdeen eighteen hours every day and night lying on the ground to sleep, so the environmental separator Aberdeen stomach was most likely due to appear cool diarrhea diseases, the proposed environmental separator winter to Aberdeen plus a place to sleep bedding or wood, insulation will achieve effective results, is "why people have to sleep at night and tuck Simmons" reasons. Fifth, drink warm water Led to the current environmental separator disease (especially female environmental separators) are a major cause of flooding is less environmentally friendly water separator, causing shortage of drinking water due to environmental separators do not want to drink warm water in summer, winter, ice water. Think about why the summer to iced drinks, to drink hot soup in winter? Is because people have the freedom to Links: www.zczqsb.com www.yczhongkun.com http://www.51yanmianban.com http://www.51mijijia.com http://www.17dazhaxie.com Squeeze chicken manure treatment, in order of biogas energy to find Dafeng Equipment Factory |
Admin>>>
You are the 26507 visitor
Copyright © GuangDong ICP No. 10089450, Dafeng biogas energy equipment factory in the order of All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26507 visitor
Copyright © GuangDong ICP No. 10089450, Dafeng biogas energy equipment factory in the order of All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

