Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8478736
| No.8478736
- Product Categories
- Friendly Links
| Information Name: | Supply dirty dung extrusion processing |
| Published: | 2011-07-08 |
| Validity: | 30 |
| Specifications: | |
| Quantity: | 1.00 |
| Price Description: | |
| Detailed Product Description: | Squeeze handle manure pollution, in order of biogas energy to find Dafeng Equipment Factory Dafeng biogas energy equipment factory in the order of Located in the beautiful and rich Yellow Sea, the National Wetland Park - Dafeng City. Founded in 1999, the plant material predecessor Jiang Su Linfeng Machinery Manufacturing Co., Ltd., in 2010 restructuring. Our factory is committed to the development of biogas energy involved in biogas production, application of biogas residue, biogas slurry and other integration processes of design and construction, and gas storage to achieve a breakthrough, the production of gas cabinets and away from the marsh-action slag, slurry separation of GM small-scale sewage treatment equipment, has achieved national patent. Patent No. divided ZL2009.2.0004245.6 and ZL2009.2.0152299.7, compared to conventional devices in the technology, life, greatly enhance the economy ... ...! Dafeng biogas energy equipment factory in the order of Address: Dafeng City Dahua Road 48, Hongji Building, 0603 Tel :0515-83284888 8,353,111,183,510,000 National toll-free hotline :400 -696-8848 Fax :0515 -83,525,288 Mobile: 15861904888 18912528444 Contact: Welwyn Website: www.yczhongkun.com www.zczqsb.com The following is the promotion of the article, and unrelated to the company's products and services: CCAS sewage treatment process of the pond while the disadvantage is that intermittent operation, manual control is almost impossible to entirely computer-controlled, treatment plant managers for the quality demanding, design, training, installation, commissioning and other work requirements more stringent. BAF sewage treatment process About the sewage treatment process: biological aerated filter, biological filter treatment plant is set packing, through artificial oxygen, so a lot of filler on the growth of microorganisms. This device consists of the sewage treatment process filter bed, gas distribution installations, water distribution installations, drainage and so on. Supporting the use of special aeration aeration device head, small bubbles generated by the repeated cutting filler to achieve close to micro-manage the aeration effect. As the response to high concentrations of sludge tanks, treatment facilities, compact, saves floor space, reduce response time. SPR urban wastewater phosphorus removal process Links: www.zczqsb.com www.yczhongkun.com http://www.51yanmianban.com http://www.51mijijia.com http://www.17dazhaxie.com Squeeze handle manure pollution, in order of biogas energy to find Dafeng Equipment Factory |
Admin>>>
You are the 26507 visitor
Copyright © GuangDong ICP No. 10089450, Dafeng biogas energy equipment factory in the order of All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26507 visitor
Copyright © GuangDong ICP No. 10089450, Dafeng biogas energy equipment factory in the order of All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

