Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8478736
| No.8478736
- Product Categories
- Friendly Links
- home > Supply > Supply of manure treatment, in order of biogas energy to find Dafeng Equipment Factory
| Information Name: | Supply of manure treatment, in order of biogas energy to find Dafeng Equipment Factory |
| Published: | 2011-07-07 |
| Validity: | 30 |
| Specifications: | |
| Quantity: | 1.00 |
| Price Description: | |
| Detailed Product Description: | Manure treatment, in order of biogas energy to find Dafeng Equipment Factory Dafeng biogas energy equipment factory in the order of Located in the beautiful and rich Yellow Sea, the National Wetland Park - Dafeng City. Founded in 1999, the plant material predecessor Jiang Su Linfeng Machinery Manufacturing Co., Ltd., in 2010 restructuring. Our factory is committed to the development of biogas energy involved in biogas production, application of biogas residue, biogas slurry and other integration processes of design and construction, and gas storage to achieve a breakthrough, the production of gas cabinets and away from the marsh-action slag, slurry separation of GM small-scale sewage treatment equipment, has achieved national patent. Patent No. divided ZL2009.2.0004245.6 and ZL2009.2.0152299.7, compared to conventional devices in the technology, life, greatly enhance the economy ... ...! Dafeng biogas energy equipment factory in the order of Address: Dafeng City Dahua Road 48, Hongji Building, 0603 Tel :0515-83284888 8,353,111,183,510,000 National toll-free hotline :400 -696-8848 Fax :0515 -83,525,288 Mobile: 15861904888 18912528444 Contact: Welwyn Website: www.yczhongkun.com www.zczqsb.com The following is the promotion of the article, and unrelated to the company's products and services: Led to the current environmental separator disease (especially female environmental separators) are a major cause of flooding is less environmentally friendly water separator, causing shortage of drinking water due to environmental separators do not want to drink warm water in summer, winter, ice water. Think about why the summer to iced drinks, to drink hot soup in winter? Is because people have freedom, you can automatically heatstroke cold. It is suggested that the environmental water separator homes set a separate box, easy to drink warm water environmental separator. This is proved in the winter to prevent environmental separator disease have a multiplier effect. There is a saying: Details determine success or failure. Some things may be small, but troubles are endless. Brothers and sisters you would like to do small things from the start to make money to support environmental separator bar! Low winter temperatures, disinfection can not be ignored Links: www.zczqsb.com www.yczhongkun.com http://www.51yanmianban.com http://www.51mijijia.com http://www.17dazhaxie.com Manure treatment, in order of biogas energy to find Dafeng Equipment Factory |
Admin>>>
You are the 26507 visitor
Copyright © GuangDong ICP No. 10089450, Dafeng biogas energy equipment factory in the order of All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26507 visitor
Copyright © GuangDong ICP No. 10089450, Dafeng biogas energy equipment factory in the order of All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

